Korea · Naju, Jeollanam-do and 20 other sites · 2024
Korea: 21 sites built, Naju Namseok and others
2.1 MW · Operating
From Hadong in the south to Naju in the southwest, these are village power plants built over rice paddies and fields. Since 2019, 20 agrivoltaic plants have been built at villages and a university in Gyeongnam, Ulsan, Jeonnam and Chungnam, and with the rooftop-garden array on the KLES head office the total comes to 21 sites and about 2.1 MW. Beneath the panels, rice, grapes and cabbage grow as before.
Rural Korea loses people and farmland every year. Agrivoltaics leaves the farming in place and adds a second income on top of it: the village plant’s revenue comes back to the village, and the farmer keeps farming. These sites show the model already running on Korean paddies.
With the Agrivoltaics Act passed in 2026 and Solar Income Villages spreading nationwide, the question is now how farming is kept going. ENVELOPS answers it with crop-specific design, crop planning and SAMS data-driven operation.
Site list
| Region | Site | kW | Note |
|---|---|---|---|
| Hadong, Gyeongnam | Yeongcheon Village | 97.12 | decommissioned |
| Goseong, Gyeongnam | Sinchon Village | 76.8 | |
| Hamyang, Gyeongnam | Gidong Village | 97.12 | |
| Haman, Gyeongnam | Myeongdong Village | 97.28 | |
| Namhae, Gyeongnam | Gwandang Village | 97.12 | |
| Geochang, Gyeongnam | Gwajeong Village | 97.12 | |
| Goseong, Gyeongnam | Seondong Village | 83.2 | |
| Goseong, Gyeongnam | Bupyeong Village | 99.84 | decommissioned |
| Jinju, Gyeongnam | Gyeongsang National University | 30.72 | university pilot |
| Namhae, Gyeongnam | Umul Village | 97.28 | |
| Namhae, Gyeongnam | Goknae Village | 97.28 | |
| Namhae, Gyeongnam | Geumsong Village | 97.28 | |
| Namhae, Gyeongnam | Jeongtae Village | 99.64 | |
| Namhae, Gyeongnam | Seomho Village | 99.64 | |
| Ulju, Ulsan | Guryang No. 1 | 99.64 | |
| Ulju, Ulsan | Guryang No. 2 | 99.64 | |
| Ulju, Ulsan | Guryang No. 3 | 99.64 | |
| Taean, Chungnam | Banggal 1-ri | 347.76 | |
| Naju, Jeonnam | Namseok No. 1 | 107.16 | |
| Naju, Jeonnam | Namseok No. 2 | 84.6 | |
| Yuseong, Daejeon | KLES head office roof | 30.72 | rooftop array and rooftop-garden agrivoltaics |
- Country
- Korea · Naju, Jeollanam-do and 20 other sites
- Year
- 2024
- Capacity
- 2.1 MW
- Crops
- Rice, grapes, napa cabbage and others
- Partners
- KLES, Gyeongsang National University
- Funders
- Korea Energy Foundation, Large & Small Business, Agriculture and Fisheries Cooperation Foundation, Korea South-East Power, Korea East-West Power, KEPCO
- Status
- Operating
Source · related document