Skip to content

Solutions

Develop, design & build, operate.

We work to the standard institutions, utilities and investors can take straight into their own review. Scope, deliverables and track record for each capability.

Develop

Feasibility · Finance · Safeguards

We prepare projects to pass lender and institutional review, using a stage-gate process with explicit deliverables and go/no-go criteria at each step.

Deliverables: feasibility report, financial model, risk register, concept note

Ovalau, Fiji 4 MW in development (GCF-approved 2020, PPA 2023, 200 kW-class pilot completed 2023) · GGGI Rwanda preliminary study and roadmap (2024) · GGGI Ethiopia feasibility study (2025)

  • Pre-feasibility and full feasibility (technical, financial, social, environmental)
  • Site, solar resource and crop suitability analysis
  • Project-finance model with sensitivity and scenario analysis
  • Environmental and social safeguards, risk allocation
  • Concept notes for development finance institutions and climate funds

Stage-gate: the Ovalau, Fiji case

Each stage ends with deliverables and a go/no-go decision. Below is the actual path of the Fiji project, which has passed every gate from identification to the main project.

  1. Identification

    KOICA GCF project identification (2018)

    Deliverable: concept note

  2. Pre-feasibility

    KEITI pre-feasibility study (2019)

    Deliverables: feasibility report, financial model

  3. Proposal and approval

    GCF funding proposal with KOICA support → approved by the GCF Board at B.26, SAP016 (2020)

    Deliverables: funding proposal, safeguards documents

  4. Pilot

    200 kW-class pilot plant built under a Korea Energy Agency programme (2023)

    Deliverables: pilot design, crop data

  5. PPA and financing

    25-year power purchase agreement with Energy Fiji Limited (2023) · financing with the Fiji Development Bank

    Deliverables: PPA, financing structure

  6. Main project

    4 MW agrivoltaic plant in development

    Deliverables: detailed design, construction, SAMS operation

Design & Build

Crop-specific shading · APV structures · standard construction

Purpose-built agrivoltaic structures and crop-specific shading design produce a plant that keeps farming viable. Machinery paths, work safety and grid connection are handled at the design stage.

Deliverables: concept, basic and detailed drawings, structural and electrical calculations, construction specifications

21 sites in Korea (KLES and ENVELOPS track record) · Bogor (soybean, shallot) · Da Lat (artichoke) · Jamaica (50 kWp) · Fiji pilot (200 kW-class) · Chiang Mai (25 kW, under construction)

Bogor pilot structure under construction, from above
Bogor pilot · purpose-built agrivoltaic structure under construction (Aug 2024)
  • Shading rate, panel layout, clearance and pillar spacing per crop
  • Structural safety (wind, snow) and shading simulation
  • Electrical and grid-connection review, permitting support
  • Agrivoltaic-specific standard construction and supervision
  • Dynamic (tracking) structures, applied at the Bogor and Jamaica pilots

Operate

SAMS data operation · farming verification · farming service

We operate the plant and the farm together. SAMS gathers generation, crop and microclimate data and produces the farming-verification and settlement reports required throughout the project term.

Deliverables: monthly operation report, farming-verification report, settlement statement

Two Agronomy 2026 papers · 3 registered patents · CTCN ASIA25 SAMS presentation

Weather station at the Bogor pilot
Bogor pilot · weather station beside the dynamic array (2024)
  • SAMS monitoring: irradiance, temperature, humidity, wind, soil moisture, generation
  • Balance of shading and generation, driven by crop growth models
  • Farming-verification and settlement reports for authorities and lenders
  • Farming service, seeding to harvest (optional)
  • O&M, scheduled inspection, anomaly alerts

Nexus

Agriculture and energy, joined around agrivoltaics.

Beyond generation and farming, these components are designed in where the site needs them.

Smart irrigation · Cold storage and agri-processing · E-mobility (Bogor pilot) · Farm automation and connectivity

Korea

Solar Income Villages.

In Korea, ENVELOPS supports municipalities and resident cooperatives under the government's Solar Income Village (햇빛소득마을) programme: agrivoltaic-specific design, crop planning and SAMS data operation for the farming verification the new Agrivoltaics Act requires. Programme page (in Korean).

Other services

Energy and environment development services

Engagements outside agrivoltaics. Each line rests on a certificate of performance or a contract from the commissioning body.

Biomass and waste-to-energy

  • Development of a multi-MWe overseas biomass power demonstration project · Jangwoo Machinery (2018)
  • Pre-feasibility market study for torrefaction-based waste-to-energy in Indonesia · Green Technology Center (2019)
  • Development services for the 2.5 MWe Rambutan EFB biomass power project, Indonesia (2020–2021)

Renewable-energy feasibility and development

  • Feasibility study for the Bambang small-hydro plant, Sulawesi, Indonesia · Korea Energy Agency (2019–2020)
  • Pre-feasibility study for 1 MWp agrivoltaics in Port Antonio, Jamaica · Korea Energy Agency (2023–2024)
  • Local project development for the 1 MWp rooftop-solar ODA pre-feasibility study, Funafuti, Tuvalu (2023)
  • Localisation of a map-based solar generation forecasting system in Fiji · Korea Meteorological Industry Promotion Agency (2019–2020)

Climate technology cooperation (UN CTCN technical assistance)

  • Technical assistance for rainwater harvesting systems in Mozambique · KEITI (2021)
  • Technical assistance for low-carbon transport technology in Cambodia · National Research Foundation of Korea (2019–2020)
  • Technical assistance for public-transport system development in Ethiopia · National Research Foundation of Korea (2018–2019)

Energy policy consulting

  • Master plan and capacity building for solar-powered electric two-wheelers in Indonesia · Korea Energy Agency energy policy consulting programme (2022–2025, four years)

Power-plant engineering, construction and maintenance are handled together with our partner KLES. Supporting documents are shared on request · info@en-velops.com

We scope the work to your project stage.